Retaining Wall Block and Gravel Calculator

Blocks needed = courses × (wall length ÷ block length), where courses = exposed height ÷ block height plus the buried base courses, with waste added.

Estimate only. Results are estimates. Verify against the applicable code and manufacturer specifications before relying on them for safety-related work.

ft
ft
in
in
A common minimum is to bury the first course; taller walls bury more. Check the block maker's instructions.
in
in
in
in
%
Wall blocks to order (with waste)
221blocks
Total courses (including buried)7 courses
Cap blocks to order (with waste)32 caps
Base gravel (compacted volume)1.48 yd³
Drainage stone behind the wall5.19 yd³
More results (1)
Perforated drain pipe
40 ft

Any wall that holds back a slope with a driveway, building, or steep bank above it (a surcharge) needs an engineered design, whatever the height.

Show the math

Courses = ⌈36 in ÷ 6 in⌉ + 1 buried = 7
Blocks per course = ⌈480 in ÷ 16 in⌉ = 30
Blocks = 7 × 30 × (1 + 5%) = 221
Base gravel = 40 ft × 2 ft × 0.5 ft ÷ 27 = 1.48 yd³

Rounded the same way as the result above.

How it works

A segmental retaining wall is a stack of blocks set on a compacted gravel base. Divide the wall length by the block length to get blocks per course, and the exposed height by the block height to get the courses above ground. Add the buried courses at the bottom, which anchor the wall.

Behind the wall goes free-draining stone and a perforated pipe, so water does not build up pressure on the wall. That stone and the base gravel are ordered by the cubic yard. Add a waste allowance for cuts and breakage, and cap blocks along the top.

Courses = ⌈exposed height ÷ block height⌉ + buried courses Blocks per course = ⌈length ÷ block length⌉ Blocks = courses × blocks per course × (1 + waste) Base gravel (yd³) = length × trench width × depth ÷ 27 Drainage stone (yd³) = length × wall height × thickness ÷ 27

Worked example

A 40 ft wall, 3 ft exposed, of 16 × 6 inch blocks with 1 buried course, 5% waste, a 24 inch by 6 inch gravel base, and 12 inches of drainage stone:

  1. Courses = ⌈36 in ÷ 6 in⌉ + 1 buried = 7
  2. Blocks per course = ⌈480 in ÷ 16 in⌉ = 30
  3. Blocks = 7 × 30 × (1 + 5%) = 221
  4. Base gravel = 40 ft × 2 ft × 0.5 ft ÷ 27 = 1.48 yd³
InputValue
Wall length40 ft
Exposed wall height (above grade at the face)3 ft
Block face length16 in
Block height6 in
Buried courses below grade1
Cap block length16 in
Base trench width24 in
Compacted gravel base depth6 in
Drainage stone thickness behind the wall12 in
Waste and breakage allowance5 %
ResultValue
Total courses (including buried)7 courses
Wall blocks to order (with waste)221 blocks
Cap blocks to order (with waste)32 caps
Base gravel (compacted volume)1.48 yd³
Drainage stone behind the wall5.19 yd³
Perforated drain pipe40 ft

Assumptions and limits

  • A simple takeoff. It does not design the wall, choose geogrid, size the embedment, or check soil, drainage, or surcharges.
  • Corners, curves, steps, and cuts increase waste. Use a higher allowance for irregular walls.
  • Stone volumes are compacted or in-place volumes. Crushed stone is often ordered by the ton: about 1.4 tons per cubic yard for common gravel, but ask your supplier.
  • Block dimensions vary by manufacturer. Use the face length and height from the product data.

Common questions

How many retaining wall blocks do I need?

Divide the wall length by the block face length, then multiply by the total number of courses, including buried ones. Add 5–10% for waste. Use the tool above for the exact count.

How high can I build a retaining wall without a permit?

The model building code exempts walls up to 4 feet from the bottom of the footing to the top, unless they support a surcharge, but local rules differ. Check before you build.

How much gravel do I need behind the wall?

A common practice is about 12 inches of clean drainage stone behind the wall, running the full height, with a perforated pipe at the bottom that drains to daylight.

How deep should the first course be buried?

It varies with the block maker's instructions and wall height. Many manufacturers call for at least one course or 6 inches, more for taller walls.

Sources

  • Quantity takeoff arithmetic (geometry and 27 ft³ per cubic yard).